THIS ARRANGEMENT SHALL COVER THE UPGRADING OF THE ELECTRICAL STATION IN ROSSANO BY REPLACING THE CURRENT ATR BY 250 MVA WITH A NEW GENERATION ATR 400150 (ISOLATED IN VEGETABLE OIL) FROM 400 MVA. THIS WORK WILL: INCREASING THE TRANSMISSION CAPACITY, AS BETWEEN THE TRANSMISSION NETWORK ITSELF AND BETWEEN THE TRANSMISSION NETWORK AND DISTRIBUTION NETWORKS, PREVENT THE FORMATION OF BOTTLENECKS IN THE INTERCONNECTIONS BETWEEN THE TRANSMISSION NETWORK AND THE DISTRIBUTION NETWORKS, INCREASING THE AMOUNT OF ELECTRICITY PAYABLE IN THE GRID BY RES INSTALLATIONS, WHILE CONTINUING TO OPERATE THE NETWORK SAFELY. INCREASING THE NETWORK’S CAPACITY TO ABSORB AN INCREASED SHARE OF ENERGY FROM RENEWABLE SOURCES INSTALLED ON THE DISTRIBUTION NETWORK (DISTRIBUTED GENERATION).