THE WORK IN QUESTION CONCERNS THE CONSTRUCTION OF A NEW 150 KV OVERHEAD POWER LINE TERNA BETWEEN THE S.E. OF PONTELANDOLFO AND S.E. III BY A SIMPLE TERNA ARMED TERNA, WITH THREE STEPS EACH CONSISTING OF A BEAM OF 2 ENERGY CONDUCTORS AND TWO ROPES ON CALL, UP TO THE LEVEL OF THE SAME STRUCTURE WITH BEATS OF CONDUCTORS, BETWEEN THE TERMINAL SUPPORT AND THE STATION PORTALS. THE PROJECT WILL BE CHARACTERISED BY INNOVATIVE SOLUTIONS SUCH AS DTR, WEATHER STATIONS, MONITORING LANDSLIDES, BIRD STRIKES, BIRD CAM AND FIBRE OPTIC INPUT.