THIS EXECUTIVE PLAN, WHICH HAS BEEN DESIGNED TO REDUCE THE HYDRAULIC DANGER ALONG THE RIO DE SCALERS’ RIO OBJECTIVE, IS PART OF A GENERAL PROJECT WHICH AIMS TO SECURE THE LOCALITATE OF VARNA IN THE MUNICIPALITY OF VARNA, WHICH IS, AS SHOWN BY THE ATTACHED HAZARD ANALYSIS, PARTLY IN A HIGH-RISK AREA. AS A RESULT OF THIS MI-SUA, IT IS NECESSARY TO ENSURE THAT THE INFRASTRUCTURE IS ADAPTED. IN THE PRESENT CASE, A ROAD TO ACCESS AND CONSEQUENTLY ADAPTED OR CARRIED OUT THE PIPES AND/OR ALLUACEN-TI OF DRINKING WATER, BLACK WATER, ELECTRICAL ENERGY, GLASS FIBRE AND PIO-VANE. IN ADDITION, SPECIFIC STEPS SHOULD BE TAKEN TO MAKE THE ‘KNEIP’ COURSE DEFENCES SECURE. A COMPLEMENT