Kohesio: discover EU projects in your region

project info
Start date: 29 December 2017
End date: 28 February 2019
Project website: link
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 145 000,00 €
EU contribution: 72 500,00 € (50%)
programme
Programming period: 2014-2021
Programme: Marche - ERDF
Managing authority: Servizio Risorse Finanziarie e Bilancio - "Posizione di Funzione Programmazione Nazionale e Comunitaria”
beneficiary

* * * * e-mail * * e-mail * Tel: 0731703723 Â ‚3491257574

THIS BECOMES AN INVESTMENT PROJECT 1). THIS COMPANY INTENDS TO PURCHASE A WORKING CENTRE RCD 85 MONOBLOCK. THE WORKING CENTRE IS A SMALL AND MEDIUM-SIZED MILL WHICH ALLOWS STEEL BLOCKS TO BE WORKED IN ORDER TO PRODUCE PIECES OF MOULDS WHICH WILL BE ASSEMBLED IN SUCCESSIVE STAGES OF WORK. RCD 85 Ê EQUIPPED WITH AN AUTOMATIC PALLET EXCHANGE SUBSYSTEM MAKING AVAILABLE TO MY USER A TOTAL OF SIX PALLETS, EACH WITH A LOAD LIMIT OF 800 KG AND A SIZE OF 630 X 630 MM. THE MAXIMUM DIAMETER OF ÃO PIECES IS APPROXIMATELY 800 MM FOR A PART HEIGHT OF 600 MM. THE SYSTEM OPTIMISES THE AREA OF WORK FOR LINKING THE PALLET CHANGE AND WILL PROVIDE AN EXCELLENT ACCESSIBILITY TO THE WORK AREA AND TO THE EQUIPMENT STATION. THE DESIGN OF THE MACHINE RETAINS FULL LOAD OF THE LOAD ON THE DAL UP TO THE TOP OF THE OVERHEAD TRAVELLING CRANE, PRESENT ON THE FARM. THE STRUCTURE BINDS TOGETHER IT WITH A SUPPORTING SURFACE.

Flag of Italy  Province of Ancona, Italy