Start date: 1 September 2020
End date: 31 December 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 27 132 416,47 €
EU contribution: 15 260 960,20 € (56,25%)
programme
Programming period: 2014-2020
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego
European Commission Topic

Construction of a geothermal-biomass heating plant in Sieradz with injection hole Sieradz GT-2

The project will consist of the construction of a geothermal-biomass heating plant in Sieradz with a capacity of 22 MWt, together with the drilling of the injection hole SIERADZ GT-2. The opening shall be made as directional type “J” with a final depth of approx. 1898 m at an actual vertical final depth of approx. 1525 m ± 10 %. The geothermal heat room will be based on the work of the geothermal double, i.e. two geothermal holes: the Sieradz GT-1 operating hole and the Sieradz GT-2 injection hole. Geothermal water obtained from the Sieradz GT-1 operating hole will be used in two ways: • As a direct heat source for district heating (pre-heating of mains water return) by transferring heat in plate-twisted heat exchangers; heat exchangers will allow to heat the mains water to a maximum of 52 °C, while cooling the geothermal water to approx. 49-50 °C (cooling of the geothermal water will depend on the return mains water temperature and can range from 0 to approx. 5 K); • In the second place, geothermal water will be the lower heat source for heat pumps; it is assumed to use 2 absorption bromolite heat pumps with a heat output of approx. 10 MWt each.

Flag of Poland  Koniński, Poland