The project concerns an investment activity which will consist of: * deepening the approach track to the Gdynia Port to the tier – 17.00 m (to the head of the breakwater), * widening the approach track to 280 m (length 3.714 m), * securing the fiber route on the design gauge of the approach track, * securing/rebuilding the entrance to the port with leaving the main entrance width of 140 m.