The project, in the design and construction system (yellow FIDIC) is located in the Wielkopolska Voivodeship, in the Kępno and Baranów districts. It aims to build a bypass of Kępno within the S11 expressway with a total length of 8,14 km (including 6.90 km of S-class road and 1.24 km of GP-class road). This section is the southern part of the Kępno bypass from the Kępno-Kępno junction built as part of the construction of the S8 Syców expressway – Kępno – Wieruszów – Walichnowa to the existing national road No 11 in the area of Baranów. This bypass follows a new trail on the east side of Kępno. On the Kępna ring road there were two nodes “Kępno East” and “Baranów”.