Start date: 10 May 2018
End date: 31 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 14 844 114,18 €
EU contribution: 6 737 733,23 € (45,39%)
programme
Programming period: 2014-2020
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego
intervention field
European Commission Topic

Construction of the Witnica – Gorzów Wielkopolska gas pipeline and the gas network in Kostrzyn nad Odra

The gas network of Kłodawa – Witnica through Gorzów Wielkopolski and the medium pressure of Witnica – Kostrzyn nad Odrą will be a secondary power supply to Gorzów Wielkopolski (especially the economic and industrial zone) and will allow to increase gas consumption in the KSSSE in Kostrzyn nad Odra. In addition, the project will contribute to the security of gas supply within municipalities using the gas distribution network, in particular municipalities: Kłodawa, Lubiszyn, Bogdanc, Witnica, Gorzów Wlkp. And Kostrzyn n/Oder. The project will be implemented in less developed areas. The direct objective is to increase access to the gas network and the technical transmission capacity of the Kłodawa – Witnica via Gorzów Wlkp. and Witnica – Kostrzyn n/O. ZAKRES material pipeline. The investment task consists of the construction of a pipeline in DN 250 and DN 300 of Witnica – Gorzów Wlkp. about approx. 43.1 km with gas station in Gorzów Wlkp. Q= 10,000 m³/h and construction of medium pressure network dn 250 PE in Kostrzyn n/O approx. 4.9 miles.

Flag of Poland  Gorzowski, Poland