The implementation of this investment will concern the thermomodernisation of the “Stokrotka” preschool building located at ul. Józef Krzyminski 6 in Inowrocław. The technological solutions and scope of work to be carried out under this investment task result from the energy audit of the building. The implementation of thermomodernisation works will be carried out in the scope of:• replacement of window and door joinery,• warming of basement walls and foundations in the ground,• insulation of external walls – plinth,• insulation of external walls – above the plinth,• warming of the floor above the basement,• warming of the ceiling above the basement,• warming of the windmill,• modernisation of the central heating system (without a heat junction), • replacement of lighting fixtures on the facade • accompanying and complementary works necessary for proper operation of the building after thermal modernisation works, i.e. improvement of ventilation by installing ventilators, replacement and modernisation of lightning system, demolition of the perimeter of the building, demolition of the terrace surface, renovation of stairs, renovation of existing brick lighting of basement windows, restoration of the driveway, restoration of bituminous surfaces, restoration of terrace, renovation of gratings and balustrades. The implementation of this investment task will significantly improve the quality of the operating conditions and optimise the costs incurred primarily for the heating purposes of the building. The thermomodernised facility does not meet the current energy standards that buildings should meet and therefore there is an increased heat consumption.