The project is aimed at improving the lighting infrastructure in the city of Janikowo. The beneficiary of the project is the Municipality of Janikowo. It is worth noting that, due to the nature of the investment, the final beneficiaries should include the inhabitants of the area covered by the project, since they will benefit most from the investment covered by this application. The main problem identified is the inefficient use of energy, which results in high operating costs and emissions of environmentally harmful substances.The main objective of the project is to reduce electricity losses and reduce greenhouse gas emissions. The material scope and timing of the investment are as follows: 1. Technical design: 02,2019-07,20192. Laying of power cables – 1st stage: 05,2020-12,20203. Installation of poles and lighting fixtures with accessories – 1st stage: 01,2021-06,2021 4. Checking and measuring electrical circuits, insulation resistance, grounding and automatic shutdown – I stage: 01,2021-06,2021 5. As-built project – Phase I: 04,2021-06,2021 6. Laying of power cables – stage II: 05,2020-12,20207. Installation of poles and lighting fixtures with accessories – II stage: 01,2021-06,2021 8. Checking and measuring electrical circuits, insulation resistance, grounding and automatic shutdown – stage II: 01,2021-06,20219. As-built project – Phase II: 04,2021-06,2021 10. Laying of power cables – stage III: 05,2020-12,202011. Installation of poles and lighting fixtures with accessories – stage III: 01,2021-06,202112. Checking and measuring electrical circuits, insulation resistance, grounding and automatic shutdown – stage III: 01,2021-06,202113. As-built project – Phase III: 04,2021-06,2021 14. Promotion of the project: 05.2020-06.2021