Kohesio: discover EU projects in your region

project info
Start date: 28 September 2017
End date: 31 December 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 444 599,11 €
EU contribution: 377 909,24 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski, Departament Rozwoju Regionalnego
European Commission Topic

“Construction of the Municipal Waste Settlement Point with equipment, infrastructure, weight, fence and necessary equipment, educational room, exchange of used goods and installations for ecological education on parts of plot no. 208/32 in the village of Kruśliwiec within Sławęcinek, Municipality of Inowrocław” “PSZOK construction with infrastructure for the Municipality

The project is aimed at developing the infrastructure of the municipal waste collection system in the municipality of Inowrocław. Applies to the construction of PSZOK in places.Kruśliwiec. Thanks to the implementation of the investment, 1 PSZOK will be created, in which it will be possible to hand over separately collected waste. Residents of the municipality will select the waste generated by them (so-called segregation of waste at the source) in order to separate the relevant fractions from them (in accordance with the Regulation of the Minister of the Environment of 29 December 2016 on the details of the collection of selected waste fractions. The separated fractions will be delivered to suitable containers, containers and rooms constituting PSZOK equipment. The remaining municipal waste will be collected from the resident in accordance with the regulations in force for the maintenance of cleanliness and order. Residents will be able to bring waste and reusable items to PSZOK. Some of them, which do not require repair, will be handed over to the residents concerned. .The implementation of the project assumes the acceptance of 17 selected waste fractions. The planned project will be located on the part of the plot no. 208/32, area 0038 Sławęcinek, Gm. Inowrocław, district of inowrocław. The project plans to: construction and assembly works and equipment. In addition, construction supervision and promotion are planned. The project is institutionally and legally feasible. The municipality employs people who have knowledge and experience in managing this type of project. In order to achieve the objectives set, the option consisting of the construction of PSZOK in the selected location was chosen. The project is technically and technologically feasible. Through the implementation of the project, the situation of the local community in Gm. Inowrocław will improve and the municipality itself will become an attractive place to live and live.

Flag of Poland  Inowrocławski, Poland