Project entitled: ‘Strengthening and exploiting the endogenous potential of Włocławek through tourist and recreational management of the Włocław Lagoon’ includes the extension of the site of the marina created as part of the task: “Tourist development of the Włocław Lagoon”, implemented with the participation of EU funds under the ROP WK – P 2007-2013. The area consisting of the development of the above-mentioned project is located on the left bank of the Włocławek Włocławek water reservoir in the immediate vicinity of the side barrier. The design objectives concern both the hydrotechnical part located in the reservoir waters and the land part. The construction of a second mooring bridge for 30 vessels, the construction of a new slip for larger vessels and the extension of the existing dr. located on the crown of the flood defence shaft, which is now an access to the existing pier, are assumed. As regards the land development of the land plot, comprehensive land development is envisaged through the construction of a swimming pool, a water playground, a playground with an outdoor gym and a locker room and sanitary facility for users of the resulting infrastructure. In addition, the location of 8 camping houses, camper, tent and camping grounds, construction of a canteen building and a sanitary building. At the same time, the location of wooden world and camping tables and hangar was planned. Transport routes and internal access roads will be delimited throughout the area, the entire area will be equipped with the necessary infrastructure and media. The aim of this investment is to strengthen and exploit the endogenous potential of Włocławek through tourist and recreational management of the Włocław Lagoon. As a result of the project, it envisages strengthening cooperation with municipalities and centres with recreational and tourism potential located at the Lagoon.