The applicant planned the construction of three photovoltaic installations in Gozdnica on junction Nos 569, 84, 90 with a total capacity of 93.50 kWp. The applicant specified the following stages of the project: 1. Construction of photovoltaic installations. 2. Feasibility Study and Functional-Usage Program. 3. Promotion of the project. 4. Project of photovoltaic installations. Production. electr. energy entirely will be used for own needs. The target groups for the project will be: local community (municipal), local economic operators. The main objective of the project is to increase the production of renewable energy, including reducing energy losses and contaminating. The project also assumes a decrease in the level of unemployment in the municipality. RES electricity generation units built: 3 pcs; Additional renewable electricity generation capacity: 0,09 MWe; Number of enterprises supported: 1 pcs, Length of newly built electricity grids for renewable energy sources: 0 km, Length of upgraded electrical grids for renewable energy sources: 0 km, Number of entities using information and communication technologies: 1 pcs. Result indicators: Estimated decrease in greenhouse gas emissions: 82.63 tons of CO2/year; electr. power production from newly built installations utilised. RES: 102,52 MWhe/year;Increase in supported entities (other than enterprises): 1 FTE; Increase in difficulty in supported entities (other than companies) – women: 0 FTE;Increase in supported entities (other than enterprises-men: 1 FTE. The chosen technol solution presents the most effective option in terms of the ratio of costs to the project’s planned results.[...]