The project will be implemented in Skwierzyna. The main objective of the project is: Improve the thermal insulation and reduce the energy demand of the ZST Internat in Skwierzyna. The planned investment is fully comprehensive and includes improving the thermal insulation of the facility by: — insulation of external partitions – partial replacement of window and door joinery • redevelopment of heating systems (including replacement and connection to a heat source) • reconstruction of the ventilation system • other energy efficiency measures, i.e. installations using RES (volume collectors, heat pumps and photovoltage cells) The operation of the above-mentioned works will significantly reduce the thermal energy demand of the building and thus significantly reduce emissions of the main air pollutants (sulphur dioxide, nitric oxide, carbon oxide, dust) and carbon dioxide. As a result, the air quality in the municipality of Skwierzynie will improve and the living conditions of its inhabitants will also improve. The target group of the project is g.Skwierzyna. The total costs are: PLN 1.266.318.98, including eligible costs: PLN 1.110.293.47. The project is included in the PGN and the Revitalisation Programme for the municipality of Skwierzyna. The application has complete technical documentation., SW, the necessary opinions and arrangements, as well as resources and experience. to carry out the project. The scope of the project does not qualify him for the obligation to carry out an EIA. The project will achieve the following output and result: — Number of modernisations. energetic buildings -1pcs. — L.zmodern. heat sources-1pcs. — L.Construction of RES heat generation units – 2pcs. — L. construction of one electricity from RES – 1 pcs. — Estimated annual decrease in greenhouse gas emissions(CI 34)- 247.93 tonnes of equivalents. CO2/year – Amending annual primary consumption in public buildings(CI 32)-728520.37 kWh/year. — Apart from the project, in respect of the volume covered by the threshold revi