Kohesio: discover EU projects in your region

project info
Start date: 1 May 2020
End date: 31 December 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 222 848,85 €
EU contribution: 189 421,52 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Małopolskiego obsługiwany przez Urząd Marszałkowski Woj. Małopolskiego – Departament Zarządzania Programami Operacyjnymi,
beneficiary
European Commission Topic

Establishment of the Selective Waste Collection Point in Wola Łużańska

The object of the project is the creation of a new Municipal Waste Segment Point in Wola Łużńska, the Municipality of Łużna. The current waste reception infrastructure is insufficient for the needs of the municipality’s waste management and the needs of its inhabitants. Currently, the facility in which the service serving as PSZOK is provided for residents has a limited storage space and ensures the collection of waste only twice a month due to the poor state of the office’s administrative facilities and the lack of possibility of organising permanent on-call duty. Currently, 10 fractions of waste are collected: 1 paper,2 metal,3 plastic,4 glass,5 green and biodegradable waste,6 waste electrical and electronic equipment,7 construction and demolition waste,8 worn tires,9 furniture and bulky waste,10 hazardous waste including expired medicines, chemicals and waste batteries and accumulators.The demand for the collection of more waste in individual fractions is large. There is a need to refurbish office facilities and to build boxes for the storage of more waste, as well as the world of machinery and equipment to operate the new PSZOK. It is also necessary to harden the site and ensure proper internal communication. As part of the implementation of the project:1. Modernisation of the building for the needs of PSZOK in Wola Łużńska2. Construction of the economic world for the needs of PSZOK in Wola Łużanska3. Construction of waste boxes for the needs of PSZOK in Wola Łużańska4. Development of the area of the new PSZOK in Wola Łużńska5. Preparation of technical documentation system design and build6. Development of an economic and financial analysis of the project7. Promotional activities and indirect costs. Detailed scope of the investment and technical parameters can be found in point. C.2.3 and point Q.

Flag of Poland  Nowosądecki, Poland