The project will be located in Michałowo, Michałowo Municipality, Białostocki District, Podlaskie Voivodeship. The agricultural biogas plant was designed on plots not owned by the Applicant (plot Nos 1130, 1134, 1120, 1139/1, 1125/1, 1135/2, 1138), but it has a contractual right to dispose of the property for the purposes of the project. The total area of the plots is over 3.5 hectares, which guarantees sufficient area for the construction of an agricultural biogas plant with the necessary accompanying infrastructure (approx. 16,800 m²). The project concerns the construction of an agricultural biogas plant with a total installed capacity of up to 0.6 MW, consisting, inter alia, of the following elements: — fermenter: in the tank there will be a process of primary fermentation, – dofermentor: in the tank there will be a process of secondary fermentation, – the final tank: storage tank for digestion residues (liquid digestate), – installation chess: building serving as the main pumping station located between the fermentation tank and the digestate, – the gas condensation chess: special well for receiving condensate from transported biogas, – two-chamber silo for silage, – prefabricated transformer station, – container cogeneration unit with all the equipment, – garage, – paved areas, – internal technological installations. The project plans 8 tasks, in particular: preparation of executive documentation, construction of agricultural biogas plant, investor supervision. As a result of the project, an RES installation will be created that will generate electricity and heat in a high-efficiency cogeneration system using natural raw materials. Partly energy will be used for own use (approx. 10 %), surplus sold externally to the power plant and local heat consumers. The implementation of the project will create new jobs (1 post).