Kohesio: discover EU projects in your region

project info
Start date: 1 March 2021
End date: 31 January 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 560 875,90 €
EU contribution: 444 494,15 € (79,25%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Podkarpackiego obsługiwany przez Urząd Marszałkowski Województwa Podkarpackiego w Rzeszowie, Departamenty odpowiedzialne za: zarządzanie, wdrażanie osi priorytetowych I-VI, obsługę finansową, kontrolę oraz wspomagające wdrażanie
European Commission Topic

Expansion of the water treatment plant in Błażowa.

The object of the investment is the extension of the existing SUW, which is located on plots of land no.: 293, 294, 298/1, 298/2, at ul. Fighter 1 in Błażowa, which consists of the renovation of the existing building, the decommissioning of existing external installations and equipment, the construction of new technological installations and equipment, the change of the surface of the road system at the site of the station and the reconstruction of the exit from ul. It’s a fighter. The area of impact of the modernised facility consists of properties e.g. no. 293, 294, 298/1, 298/2, 299/1 located in Błażowa, area 0001 Błażowa, the region of Rzeszów, Błażowa.Expansion of the SUW in Błażowa will include:-construction of a clean water reservoir with a total capacity of 150 m³-construction of wastewater tanks (for sanitary wastewater, for sewage from chlorine plant) – construction of waste water detachers – construction of a water pumping station – water meter well-construction of the exit from ul. Hunting (municipal road) – construction of inter-site networks: water supply, sewerage, technological, electrical, ACPiA-construction of internal roads, on plots no. 293, 294, 298/1, 298/2, 299/1 located in Błażowa.The capacity of the planned station – max. 41 m³//h.Summation of the building surface of the planned land use elements:- SUW plot area (294, 298/1, 298/2, 293) – 15112 m²- construction area of the technological building – 170.62 m²- building area of clean water tanks – 50.27 m²- wastewater detachers – 150 m²- area of walking-driving tracks – 800,00 m2Building area of the existing farm building – 50,00 m2The main purpose of the project: Increase the number of inhabitants of the municipality of Błażowa using a better quality, clean and compliant water supply system. Of the Council of Ministers of 9.11.2010 on projects likely to have significant effects on the environment (Journal of Laws 2010, No 213, item. 1397), the planned investment will not adversely affect neighbouring areas and the environment and the health of residents.

Flag of Poland  Rzeszowski, Poland