Kohesio: discover EU projects in your region

project info
Start date: 10 December 2018
End date: 31 December 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 389 420,31 €
EU contribution: 331 007,26 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Śląskiego, Urząd Marszałkowski Województwa Śląskiego
intervention field
European Commission Topic

Installation of renewable energy sources in Mierzęcice Municipality – stage III

The object of the project is the design, delivery and assembly of 124 photovoltaic microinstallations and 22 solar collectors installations in residential buildings. In residential buildings, there are 2 types of photovoltaic installations with a power of 2,24 kW and 3.20 kW and 3 types of solar collector sets. The main components of photovoltaic installations are: panels of 7 or 10 pieces respectively, inverter and control-measuring module. Each photovoltaic installation will operate on-grid, with the priority being to meet current electricity demand and surplus electricity to the grid. The solar system will consist of 2 to 4 collectors along with equipment, and its task will be to support the heating of the stream.

Flag of Poland  Sosnowiecki, Poland