The project includes the department. Invest. in the building UMiG Daleszyce, on a complex. thermomodernisation with the use of oze. As part of the project will be made warming of external walls, thermal insulation of basement floors, replacement of windows and external doors, garage doors and modernisation of inst. C.O. Replacement of internal lighting and photovoltaic panels will be installed to produce electricity. The project follows from the Gosp Plan. Low in terms of CO2 emissions, greenhouse gases, i.e. the reduction of broadly defined low emissions. The project will be implemented in the “design and build” formula. The project involves the installation of only new, unused elements. The aim is to increase the efficiency and effectiveness of energet.j in the public sector in the municipality of Daleszyce by thermomodernising the UMiG building and reducing emissions of harmful substances into the air by using RES and replacing lighting. The project is in line with the specific objectives. Priority axis 3 of ROP WŚ 2014-2020, i.e. increased energy efficiency of publ buildings and the residential sector, Limited emissions of dust and harmful substances into the atmosphere and with the objective of measure 3.3. — because the project will improve the efficiency of energet. using oze in the public sector. Project indicators: 1.Product: —Use area of buildings subjected to termomodernizacji:790,10m2 —L. energy-modified buildings [pcs]: 1 -L. upgraded sources ciepła:1,00 —L. built electricity generation units from OZE:1,00 2.Result: —Estimated annual reduction in gas emissions cieplarnianych:56,65Tony CO2 equivalent -Reduction of final energy consumption as a result of implementation projektów:670,29 GJ/year -Quantity of energy saved cieplnej:511,37GJ/rok —Quantity of energy saved elektrycznej:10,77MWh/rok —Reduction of annual primary energy consumption in buildings ▷ Total cost of the project: 1124763,66 zł,Dofinansowanie:894890,93 zł,Contribution własny:229872,73zł.