The object of the project is the design and construction of a photovoltaic installation with a capacity not exceeding 0,5 MW, producing not less than 452,25 MWhe of energy per year, in the form of distributed photovoltaic fields. The installation will be carried out at 11 Sokołowskiego Street in Szczecin at the Independent Public Provincial Hospital in Szczecin Zdunowo. Details of the scope of work are described in the functional and operational programme attached to the proposal. The generated current will be used for SPWSZ’s own needs. The installation will have security features to prevent energy from flowing into the external grid. The Applicant will be responsible for implementing the project. The Director of the SPWSZ will set up a Project Implementation Team, which will manage the project and oversee the implementation of the contract by the Contractor. An external entity (the Contractor) selected in accordance with the Public Procurement Act, in accordance with the Public Procurement Act, will be responsible for the execution of the construction project and for obtaining a building permit. The contractor will perform the contract in the “design and build” mode. The call for tenders will be carried out by a Tender Committee composed of employees of the SPWSZ, set up by order of the Director of the Regional Independent Public Hospital. THE MOST IMPORTANT STAGES OF THE PROJECT 1. Preparation of a feasibility study. 2. Selecting the contractor in the design and build mode. 3. Preparation of documentation and obtaining the necessary permits. 4. Construction and installation works. 5. Final acceptance of works. 6. Settlement of investments.