Kohesio: discover EU projects in your region

project info
Start date: 18 December 2019
End date: 23 December 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 13 853 080,85 €
EU contribution: 11 775 118,72 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski

Construction of Gryfic bypass – connection of roads of voivodship no. 110 (ul. Niechorska) and No 105 (ul. The Piasts).

The object of the investment is the construction of the bypass of Gryfice city with a length of about 4.34 km linking the provincial road 110 and 105. It is a road with the parameters of the main road “G” and the proposed category of traffic of the CoR 3. The scope of the works includes: — construction of a 7 m wide road section with bituminous surface, construction of two roundabout crossings at DW 110 and DW 109, construction of a crossroad with district road No 3114Z and provincial road 105, – construction of a road viaduct over the PKP line, – construction of a bridge over the Rega river, – local construction of a pedestrian-bicycle track with a pavement of concrete cubes, – construction of culverts, – construction of evaporative – drainage tanks, construction of rainwater drainage systems, construction of road lighting, – reconstruction of telecommunications, electricity, plumbing, – vertical and horizontal markings.

Flag of Poland  Szczeciński, Poland