The project includes the extension of the Primary School in Racimierz. The building area of the new part will be 228.8 m². The end of the project implementation period is planned for 12/2019. As part of the project, 4 tasks are planned: 1.Development of project documentation. 2.Construction works 3.Investor supervision. 4.Promotional activities. The following are designed on the site of the investment: • expansion of the ground floor part of the school with teaching rooms, library. • reconstruction of sanitary sewerage and rainwater sections ending with absorbent wells, • construction of rainwater for the new part of the building. The main objective of the project is: Improve the quality of life of residents of the sub-area of regeneration by increasing access to public services – educational services. The addition of an additional teaching space will allow to meet the requirements and conditions covered by the educational reform and the introduction of two additional yearbooks of children to the School. The specific objectives are: — The development of public services aimed at the inhabitants of the regeneration area; — Integration of the local community through the involvement of the local community in the implementation of the project and the activities of the school; — The use of children’s and young people’s leisure time; — Improving public space; — Animating measures to boost professional skills. The project will contribute to the implementation of indicators: 1.Product: number of supported infrastructure facilities located in revitalised areas – 1pcs; —area of revitalised areas – 0.21 ha; —number of facilities adapted to the needs of people with a part-spr. —1pcs; —Number of projects that financed the cost of reasonable accommodation for people with disabilities. —1pcs; —participation of the project in relation to the area covered by the REWIT programme. —100 %; 2.Result: — number of inhabitants of the regeneration area employed as a result of the project – 1 person; Involvement of the inhabitants of the revitalisation area in the implementation of the project. —15 people