The project will replace the Ciciban building, which will move from the current energy class D in energy class B. In the context of the realisation of the project, it will replace and isolate the roof roof of the building, install thermal insulation in the floor, replace the exterior joinery and incorporate air-water heat pumps installed in the floor.