Energy renovation of the building and implementation of project activities will save by 63.5 % the heating energy needed for heating. To achieve this saving, provision is made for the thermal insulation of all roof panels, thermal insulation installed on the backyard with the design and setting of new windows and the performance of the thermal plaster instead of the existing ones on the street corner. Existing climate units, both external and internal, will be replaced by a new, improved performance. Existing fluorescent lights will be replaced by LED lighting.