The Ivanić Grad agglomeration will align with the Water Framework Directive (2000/60/EC), the Groundwater Directive (2006/118/EC) and the Urban Waste Water Treatment Directive (91/271/EEC) and the Urban Waste Water Treatment Directive through the upgrading of the waste water treatment plant III, the upgrade of the public drainage system, increase the connection to the public drainage system and the reconstruction of a part of the existing public drainage system. the total costs of the project amount to HRK 357.870.493,75, out of which the total eligible costs are HRK 286.296.395,00. The grant amount of 188.770.799,12 HRK, the aid intensity is 65.9354440 %.