The aim of the project is the construction of the Port of Baška. The total value of the project is HRK 41.166.298,55. The total ineligible costs are HRK 1.456.322,61 (mooring equipment, part of hydro and electrical infrastructure and preparatory documents). The total eligible costs shall be HRK 39.709.975,94. The net estimated revenue is HRK — 157.088,00. The total grant is HRK 39.709.975,94, of which the Cohesion Fund is planned to be HRK 33.753.479,55 and the national budget of the Republic of Croatia HRK 5.956.496,39. The duration of the project is 51 months.