General objective of the project: connecting the localities of Pîncota, Seleuș, Zărand, Sintea Mică and Cintei to the TEN-T network. The realisation of the project proposed by the Arad County ATU will contribute to the achievement of the specific objective of Priority Axis 6, namely to increase the accessibility of rural and urban areas located close to the TEN-T network by modernising the county roads. The general objective of the project as well as the specific objective are subsumed to the requirements of the investment priority, leading to increased mobility of the population in the county. Through the proposed work the project contributes to the output indicators by improving the relevant parameters: increase the speed, road safety, portance, for 5.5 km of DJ 709 Pîncota – Seleuș road and 18.810 km for DJ 792 Nadab – Seleuș road, which connects the localities to the TEN-T road corridor. The project contributes to the achievement of the result indicators of the programme by increasing the mobility of 24,250 people from the localities along the route (according to definitive data from 01.07.2016, statistical data that can be found in the TEMPO database of NSIs).