The overall objective of the project is to: Increasing the energy efficiency of the Bishop Nicolae Popovici Municipal Hospital in Beius, Stationar I composed of the “old building” and “body added” as presented in the Energy Audit Report. The present project to increase energy efficiency proposes the implementation of energy efficiency measures and the use of renewable energies (to produce the electricity needed for lighting, air conditioning and domestic hot water) which will lead to an optimised use of local energy resources for heating, domestic hot water, ventilation and lighting with sustainable effects to protect the surrounding millet. Concretely it is proposed for the two building bodies mentioned in the Energy Audit as “body added” and “old building”: — tyre insulation solutions -efficient solutions of distribution systems for heating and domestic hot water – solutions for minimising electric energy consumption – rehabilitation of sanitary and thermal installations -Energy efficient lighting solutions – water consumption minimisation solutions