The objective of the project is to rehabilitate, expand, modernise, equip the educational structure Gradinita by children with extended hours no.3 Simleu Silvaniei The target area comprises 2 different bodies: 1. The main body (54110-C1)- is the kindergarten building with a registered built area of 946 sqm, and an area of 1892 sqm. The main building is also made up of 3 similar main bodies, having two group rooms on the ground floor and 6 group rooms on the first floor and 6 rooms: changing rooms, warehousing, bathrooms for children, which are connected to each other by means of a central connecting body, body that includes functions serving the program principal:alimentația children, laundry/journey with adjacent spaces, lockers and toilets for kindergarten staff. The total number of group halls is 8 rooms, besides these there is a gym and a hall of the CRED center. 2. Storeroom (54110-C2)- with storage operation. We want the rehabilitation and modernisation of the main body C1, the demolition of the C2 body and the construction of the new annex (main building extension). The new building built in place C2 will be linked to the main building, and will be used as an access area in the kindergarten and changing rooms for the staff working at the kitchen. In the direction of this objective Simleu Silvaniei city resorted to the following actions: in 2014 the Local Sustainable Development Strategy of Simleu Silvaniei for 2014-2020 and the Local Action Plan for the Sustainable Development of Simpleul Silvaniei for 2014-2020 were approved by HCL 60/28.08.2014. At the Chapter of the Action Strategies Directorate, within the Strategic Directorate 2 "Development of local infrastructure", Operational Objective 2.1 – Ensuring access to the infrastructure and quality education services for all inhabitants, Sub-objective 2.1.1 Creation/rehabilitation/modernisation/extension of the educational infrastructure and the increase of the Educational Act, it is mentioned as projects "Rehabilitation/modernisation/extension of educational units In this context the rehabilitation and endowment of the children’s kindergarten no. 3 is part of the proposed action plan, contributing to increasing the quality of the educational act. The project is also in line with the specific objective of Axis 10.1 – Increasing participation in early childhood and compulsory education, especially for children at high risk of early leaving. This will ensure increased access, quality and attractiveness of education, helping to increase participation in different levels of education, reducing early school leaving and early school leaving, increasing compulsory education attainment and increasing the transition rate to the level of education