The action is included in the approved Sustainable Urban Development Strategy of the city of Trikala and concerns interventions of aesthetics and environmental upgrading of the urban area of the city of Trikala. In particular, it includes:1. Interventions on Kapodistrian street with extension of the pavements and integration on the existing cycling track. The intervention, on the side of the cycling track, has a total width of 3.80 m. On the opposite sidewalk the coating material will be replaced with blocks 2. Interventions in the area of the Railway Station with modification of the existing level crossing of Eleftherias, Gate, Evripidou and Meteora streets and forming a roundabout and reshaping the entrance of the Railway Station by forming a roundabout at the intersection of Asklipiou, Evripidou and Kavrakos roads, including the formation of the pedestrians of the wider area. With own resources of the Municipality of Trikkaion P/Y EUR 59,250,00, replaces the existing asphalt and construction of pedestrian crossings on the Garibaldi road, as well as those on the streets of Byron and Apollo at their confluence with Garibaldi street, with grey granite cubicle and the necessary marking.