This project provides for the replacement of water distribution networks in the settlements of Anapplades, Agios Theodoros and Melikia Lefkimmi in Corfu. The interventions that will be implemented with this project are the following: Placement of new distribution pipelines, total length of 9,995,00 meters in the inner water supply network of Lefkimmi, made of polyethylene (HDPE) of 3rd generation and diameters from Φ 110 to Φ 200 mm. Installation of vanes (distribution valves) within special wells, at the nodes of the network, in order to control and regulate the flow of water, but also the possibility of isolation of some part of the network.