The construction of a tourist boat anchorage in P.K. Vassiliki, D.E.Apolonia Lefkada, will be completed, which will include works to protect the anchorage, 100 berths, 4 buildings serving the anchorage and the configuration of the surrounding area.If a group of works is included in the second phase is: A. PORTABLE WORKS1. Port earthmoving 47.47 %2. Natural boulders 68,46 %3. Concrete 99.45 %4. Accessories Equipment 100,00 %5. Floating piers 100,00 %6. Roadblocks Insurance 100.00 %B. Buildings AND HOLDER Installations1. Earthmoving Destroyers 68,85 %2. Concrete 36.85 %3. Masonry coatings 100,00 %4. Networks (Hydraulic Electrics) 99,58 %5. Coatings 100,00 %6. Constructions Wooden Metal 100,00 %7. Other Finishes 92,85 %