This project provides for the replacement of the existing steel pipeline of diameter F200 from the San Martin’s Gourna Tank to the Loutsa tank with a malleable cast iron pipeline over a length of 2,300 meters and steel tubes lined with polyethylene at a length of 500 meters F200.With the construction of the project, smooth water supply will be restored to a significant area of my area.