Kohesio: discover EU projects in your region

project info
Start date: 12 March 2019
End date: 17 March 2021
funding
Fund: Cohesion Fund (CF)
Total budget: 17 100 323,00 €
EU contribution: n/a
programme
Programming period: 2014-2021
Managing authority: Ειδική Υπηρεσία Διαχείρισης Ε.Π. ΥΜEΠΕΡΑΑ
beneficiary

Waste Treatment Unit of the Regional Unit of Ilia

The object of the project is the creation of a Waste Processing Unit (AEA) of Ilia, for the service of all Municipalities of the Regional Unit (Law) of Ilia, according to the revised Regional Plan for the Management of Solid Waste (PESDA) of Western Greece. This is a plant for the mechanical – biological treatment of municipal waste with a treatment capacity of 60.000 per year to a maximum of 80.000 per year.The wastes that are fed to the ACE according to the PESDA include the residual municipal waste of the Municipalities of the Prefecture of Ilia, i.e. mixed municipal waste that is led to further treatment in ACE after the implementation of a separate collection of recyclables, as well as organic municipal waste, preselected at the source with a separate collection. Through the mechanical separation of mixed waste, anaerobic digestion and subsequent composting of organic fractions, recoverable recyclable materials (Cartoni, Plastics, Iron metals, Non-ferrous metals), compost-type soil material and biogas, used for the generation of electricity.The ACE will be constructed in the “Triantafylia” site, within the limits of the former Dimmas, Amalida and Iliadas.

Flag of Greece  Greece