The project will build the remaining internal drainage network in Varda with a length of 10.050 m, the internal drainage network in the settlement of Psari with a length of 4.000 m, the necessary transfer pipes in the SCL (depressive part of the transmission pipeline 530 m long for the Barda and a depressive transmission pipeline of 470 m length for Fish) and two pumping rooms (sub-project 1) as well as the installation of the sewage treatment (EEL) with capacity of 20 m. Subprojects 3, 4 and 5 are supportive