The project concerns the construction of a district heating network to supply the city of Florina with thermal energy to meet the needs of heating and hot water use of buildings.The thermal energy will be obtained from heat recovery facilities from the steam power station (PPC) Melitis, will be transported with a system of underground pre-insulated transport pipelines and then distributed to consumers by means of a system of sub-terranean pre-insulated distribution pipelines.With the construction of the project, the project will be provided with the entire building’s construction. A total of 2,534 buildings are expected to be fed, with a total installed thermal load of about 98.7 MW.