The project concerns the reconstruction of the southern entrance of the city of Andravida of N. Ilias of the Municipality of Andravida – Kyllini. The total length of the road’s regeneration is about 950 m and starts at the junction of Ath Street. Diakou with the National Resistance street (within the Andravidas city plan) and ends at a distance of 50 m South of the football field.The new sidewalks will have an average width of 2.00 m and will cover both sides of the road. The existing triangular rainwater drainage trenches will be injected with suitable excavation products and will then be shaped appropriately to place the blocks.The entire length of the road will be fitted with lighting bodies 3,50 m high in the urban section of the regeneration and 6.50 m lights in the intercity section.The design will serve pedestrians and disabled persons as well as specially shaped blind roads.