This project concerns the Integrated Urban Regeneration Plan “Height” and sub-projects: Theme park “Xystris” and Green City Route-With the 1st sub-project “Thematic Park Xystris” provides for the qualitative upgrading of the plot of the former factory “Xystri”. The 2nd sub-project “Green City Route” provides for the following work:(a) on either side of the road of Ypsilantos (from the confluence of St.George to the junction with the Patras street) the restoration – remodeling of the existing pavements and the widening of them by 1.5 m. b) on Charilaou Street (from Dionysos Street to the contribution to the road with the road of Patras) is planned for the construction of a single camping area. The 3rd sub-project “Undergrounding of an aerial power grid on Ypsilantou and Charilaou roads” provides for the under-grounding of the aerial power grids on these roads and with the 4th sub-project “Controls for the construction of Xystris theme park” will carry out the statutory audits of the construction works of the 1st sub-project (Xystris Theme Park)