The project concerns the construction of an internal water supply network in 2 settlements of the Municipality of Kozani. More specifically, it includes the construction of an internal water supply network of 12.510 m in the settlement of Krokos and 4.968 m in the settlement of Upper Komi from HDPE pipelines of 12.5 atm different diameters as well as the construction of the necessary isolation, control, branching and evacuation wells for the smooth operation of the network. At the same time, the project also includes the construction of waiting connections for consumers in the two settlements that will be served by the new network and already have connection, as well as the supply and installation of the necessary fire-fighting hydrants. Consumer connections are also foreseen which are not eligible costs and will be covered by the entity’s own resources.