The overall project concerns the construction of the 3rd part of Phase of the New Port of Patras. The project is “ERGO-phasing” between NSRF 2007-2013 and NSRF 2014-2020 and is implemented in two distinct phases (Phase A1΄ and Phase A2').This project concerns Phase A2΄ of the project and includes: construction work of the 5th vessel vessel, the total length of the building 219.10 m in percentage 29.43 %, construction works of 210 m length, 16,67 %, construction work in two buildings: 1 % of the building. Architectural configurations of 88,84 % and electromechanical installations of 97,42 %, complete construction of traffic configurations of the controlled (enclosed) land area of the 5th conglomerate, including the construction of stops for boarding of a total area of 5,600 m² for passenger vehicles and 3.030 m² for lorries and between traffic corridors, the full construction of the infrastructure and the building of the inland traffic of the port and the road of connection to the external network