The 1st 9/seat Primary School of Amfissa with a part of all day is now housed in buildings of great age, resulting in many operational problems. The proposed project will demolish the unregulated buildings for auxiliary use and in their place will build a new three-storey building that will accommodate their uses (teachers‘offices, pupils’ sanitary rooms and teachers) adapted to the required specifications (construction of WC AMEA, sufficient number and quality construction of WC students and teachers) and will satisfy the current needs of the school in classrooms and in a multipurpose room that the school is deprived of. It should also be noted that in the school it operates as a whole day and with a single reformed educational program (E.A.E.P) with teaching of theatrical education, IT and increased hours of English, physical education, visual arts and music. The project is of high priority, as it will serve basic needs and safety and functionality requirements in areas of main and auxiliary use, which are not served by the existing building infrastructure, in the school complex located in the most densely populated part of the city. At the same time it will reduce the operating costs of the buildings and remove the aesthetic and architectural discrepancies that affect the appearance of the listed building.