The project under study concerns the construction of an external water supply network from polyethylene pipelines of cross section O200 and strength of 16 atm and a total length of 3.200.00 m in the wider area of Prefecture of Morsini and the D.D. Evmirros of the Municipality of Xanthi and will serve the population with a 40-year forecast. This external network will be powered by the existing water supply network that includes the network of two (2) drillings in the area of Lambrinos that supply the reservoir of Viticulture of Xanthi with a capacity of 2.000 m² and currently supplies all of the BI.PE (high and low zone) as well as part of the settlement of Eumiros. The N. Morsini reservoir to be powered by this network was built in 2008 and has a capacity of 400 m².