The project concerns the construction of the new Health Center (K.Y.) Siatista on a plot of land of 2.360 m in the O.T 233 extension of the approved plan Siatista. The K.Y. under construction is type B and was studied according to the corresponding specifications of the Ministry of Health and Social Solidarity. Overall, the building is developed on three levels: Ground floor and 1st Floor. The project includes the design work of the environment and the connections with the utility networks (HEDNO, OTE, water sewerage network).