The main object of the project is the main road link, AK Terovo on the Ionian Road (on the 7th Provincial Road of Ioannina – Pigadia) with the 2nd Provincial Road of Ioannina – Plaka Bridge with a total length of 9809.27 m, which is almost universally new design and not improvement of a pre-existing road.The project comprises two level connections and the 7th road connection. Also, the installation of road lighting will be implemented in an appropriate length and layout at all 5 level knots in order to complete phototechnical control. Bridge will be constructed 134.0 m long from ch.f. 7+ 316.52 to x.h. 7+ 450.50 Main Road. This bridge provides for the installation of road illumination both on the bridge and on either side of the bridge at distances of 50 meters, with distances of 25 meters.