The project has been planned and designed to improve the level of protection of existing installations and material resources, depending on the different disaster scenarios likely to occur, giving priority to car park conditions and the storage of intervention equipment in covered space, so as to effectively mitigate all constraints on the safety and operationality of the means of transport.