The application covers the works to be carried out in Ribeira da Calheta with a view to increasing the flow section of three hydraulic passages. The intervention to be carried out is necessary due to the effects of the bad weather that devastated that site, causing two hydraulic passages to bridge the road and the opening of an erosion ditch in a nearby terrain, a fall of a third hydraulic passage and the opening of a ditch of eros