The project of Consul Dabney’s Involvement includes the implementation of the basic sanitation of this road and its surroundings, notably through the construction of approximately 1500 ml of water distribution network, 1400 ml of domestic wastewater collectors and 1800 ml of rainwater collectors. Linked to these networks are all the necessary infrastructures for their proper functioning, such as: Control system