The intervention of the “EB School 2.3 of Santa Luzia” involves the construction of a new school building and consequent demolition of four existing buildings. The new building develops in the form of “U” and consists of two floors. At one of the extremes with access covered by the outside, there is the sports hall/gym with the respective spas.A green area will be created with sowings of shrubs and persistent leaf trees.