Kohesio: discover EU projects in your region

project info
Start date: 23 January 2019
End date: 31 December 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 004 657,39 €
EU contribution: 953 968,63 € (94,95%)
programme
Programming period: 2014-2020
Managing authority: Estrutura de missão criada pelo Decreto-Lei n.º 137/2014 que funciona junto da CCDR Norte
European Commission Topic

Promotion of Energy Sustainability – Lime Bridge – Interventions in public infrastructure of local government: Decorative and public lighting systems

The objective of the operation is to reduce the electrical energy consumption at each lighting point, and can obtain significant savings, through the direct replacement of the existing reinforcement by a LED.In terms of operation and maintenance, the gains are significant, since with the introduction of the Led technology, the malfunctions are smaller, implying smaller maintenance, i.e. dislocations of technical teams for repair.

Flag of Portugal  Alto Minho Subregion, Portugal