In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil).